MHE & equipment intelligence
Machine
Forklift, BOPT, HOPT, conveyors, dock doors and robots — utilization, safety and ROI in one view.
MHE utilization
71%
target 82%
Idle machine-hours
22.1
F-03, B-12 top
Near misses (24h)
9
Aisle 6 hotspot
Conveyor idle-run
4.3h
Line 2
Dock door violations
12
open > 8m
What BLUE watches across equipment
signals detected by BLUE on existing CCTV
Forklift idle
BOPT idle
HOPT idle
Forklift without operator
Forklift overspeeding
Wrong-way movement
Forklift in pedestrian zone
Forklift near person
High / unstable pallet
Parked unsafely
Collision / near miss
Reverse risk
Load / unload cycle time
Conveyor running without load
Conveyor stopped + pile-up
Conveyor jam
Person near conveyor
Object stuck on belt
Dock door open too long
Dock door blocked
Truck waiting inactive
Bay occupied but inactive
Empty dock + truck queue
Unauthorized vehicle
Robot stationary
Robot path blocked
Robot-human proximity
Recent events
last 4 hours
- critical21:09 · F-03Forklift–person near miss · Aisle 6Safety
- high21:30Forklift F-03 idle 26m · Zone C₹4,200
- medium21:21Conveyor Line 2 running without load₹1,100/hr
- medium20:48Dock 4 door open 11m
- low20:14BOPT B-12 parked in walkway
AI insight
Forklift F-03 was idle for 4.2 hours yesterday while the adjacent dock had 3 SLA breaches. Possible scheduling mismatch between MHE allocation and dock workload. Reassigning F-03 to Dock 7 between 15:00–18:00 is projected to recover ₹42,000 and prevent 2 detention events.